The PSALM board decided to immediately rebid the asset.Īmlan is located in Amlan, Negros Oriental Province. (HNN 10/7/05) The agency said two other bidders expressed interest and asked for additional time to conduct due diligence studies of the plant, but ultimately failed to bid. Santa Clara was winning bidder for the 1.2-MW Loboc hydro project in 2004. PSALM said only Santa Clara International Corp. (PSALM) declared the initial privatization auction a failure after receiving only one bid by the July 23 deadline. The government’s Power Sector Assets and Liabilities Management Corp. 21.Ĭlock applications in computers, smartphones or other devices tied into the internet are not affected as they take their times from the internet through satellite-based calculations.The Philippines’ power sector privatization agency announced it will reissue a solicitation for privatization of the 800-kW Amlan hydroelectric project. Power was back to normal over the weekend of Aug. When BC Hydro isolates a region for maintenance or repairs, it’s then called an electrical island. The switch affected BC Hydro’s northwestern customers as far east as Burns Lake with the crown corporation using Rio Tinto power as well as power from other independent power producers. In this most recent power switch of two weeks ago, electric clock users found them running approximately 15 minutes faster. “In other words if the system is running fast for 10 hours, clock time will be 120 seconds faster than real time,” he said. The provincial crown corporation then shifts to power produced by Rio Tinto’s Kemano generators which provide the juice to run the company’s Kitimat aluminum smelter.īut because Rio Tinto’s power has a faster hertz, or cycle rate, than does BC Hydro’s power, clocks using electricity also run faster.īC Hydro calculations place its own power at 60 hertz and Rio Tinto’s at 60.3 hertz, fast enough to add 12 seconds an hour to a clock being run on electricity, a factor called “time error”, said David Mosure from BC Hydro. It happens every time BC Hydro takes its northwestern customers off of its provincial grid so it can do maintenance or make repairs.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |